Baker Hughes MiddleEast

Baker Hughes MiddleEast

Dubai Industrial City

Contractor Open now
Reputation Score
4.5
★★★★★
264 ratings
5★
70%
4★
20%
3★
5%
2★
0%
1★
5%

Source: Google Maps

Is this your business?

Plan the visit

Practical details

W3Q4+9R5
National Industries Park, Dubai
Mon9:00 AM – 5:00 PM
Tue9:00 AM – 5:00 PM
Wed9:00 AM – 5:00 PM
Thu9:00 AM – 5:00 PM
Fri9:00 AM – 5:00 PM
SatClosed
SunClosed
Get directions
Let's go!

Services & prices

Energy technology solutions for industry

  • NovaLT family gas turbines
  • Steam turbines
  • Turboexpander generators

    Product Spotlight For higher power levels and pressure ratios with lower maintenance requirements in oil and gas and energy recovery applications.

  • Condition monitoring
  • Inspection and Non-Destructive Testing (NDT)
  • Pressure measurement
  • Additive Manufacturing
  • NovaLT™ technology

    Product Spotlight Setting new standards in efficiency, availability, reliability, and flexibility while minimizing total costs of ownership.

  • Steam turbines for power generation

    Product Spotlight Flexible, modular design provides project-customized solutions for best-in-class reliability and efficiency.

  • Steam Turbines for mechanical drive

    Product Spotlight Flexible, modular design enables project-customization, best-in-class efficiency, optimized steam balance and performance.

  • Gearboxes & gear couplings

    Product Spotlight High-performance gearing and gear coupling solutions and services to solve the most complex power transmission challenges.

  • Advanced Digital Services

    Product Spotlight Expertise and resources to connect your people, data, and machines to increase value and performance.

Resources

  • Condition monitoring solutions for the pulp and paper industry
  • Connect all your production assets to avoid unplanned downtime
  • USD 750
    Druck's solution saves potential production loss of k

    Case Study Druck's solution saves potential production loss of k

News and resources

  • More energy, less carbon: how CCUS is critical to our energy future

    Decarbonization In order to meet emissions goals made under the Paris Agreement, scientists agree that carbon capture, use and storage – CCUS – is a must.

  • Hydrogen compression: one of the biggest compressors ever used at a refinery
  • The big pivot: transforming for the energy transition

    Decarbonization February 24, 2021 Michele Fiorentino, EVP of Strategy & Business Development, has a powerful personal motivation as he helps to lead the Baker Hughes transformat…

  • Straight talk on decarbonization

    Decarbonization Rod Christie, Executive Vice President of Turbomachinery & Process Solutions wants you to know the oil & gas industry is serious about climate change.

Turbomachinery solutions

  • Reciprocating Compressors
  • Centrifugal Compressors
  • Turbomachinery conversion, modification and upgrades

Supporting 440+ million tons of capacity

  • NMBL - LNG ready to go
  • LM9000 gas turbine
  • LM6000-PF+ gas turbine
  • BRUSH Power Generation Synchronous Motors
  • Turbomachinery services
  • Turbomachinery digital services
  • Pre-commissioning and maintenance services
  • LM9000 aeroderivative gas turbine

    Product Spotlight The most competitive gas turbine in the 65+ MW power range.

  • Centrifugal & axial compressors

    Product Spotlight Proven high-performance technology for all applications.

Gas Power - Primary & Backup

  • NovaLT™ Gas Turbines
  • Frame 5/1 Gas Turbines
  • Gearboxes and Gear Couplings
  • 2-pole Generators
  • 4-pole Generators

Sustainable Power – Decarbonization

  • Hydrogen Technologies
  • Clean Power Solutions
  • Geothermal Solutions
  • Industrial Heat Pumps
  • Expanders

Energy Storage & Grid Stability

  • Synchronous Condensers
  • Synchronous Motors

Energy Management

  • PRISMIC™ Power Management Systems
  • PRISMIC™ Excitation Systems
  • iCenter™ Digital Services
  • Cordant™ Solutions

Delivering the shortest-cycle, lowest-carbon barrel

  • USD 4
    Production Solution saves operator million USD by eliminating workover costs
  • USD 4
    KPI KPI Value 6x KPI Description increase in ESP run life KPI Value

    KPI Description in intervention and workover costs avoided

Production Solution improves ESP system run life more than 50%

  • USD 370,000
    Baker Hughes Production Solution saves customer USD per well

    A major producer in the oil fields of Neuquén, Argentina, was experiencing calcium sulfate (CaSO4) scale deposition in the electrical submersible pumping (ESP) systems

Integrated well services

  • Mechanical pipe cutter (MPC)
  • Downhole electric cutting tool (DECT)
  • X-treme SJI mechanical slotting tool
  • Acoustic Cement Bond Log CBL service
  • Annular fracturing services
  • Aperio Pulse Echo service
  • Automated foam cement system
  • Casing integrity and cement mapping services
  • Catenary CT services
  • Cement retainers
  • CemMaster zonal isolation cementing software
  • Certia log and cut

From bakerhughes.com, read Oct 25, 2026. Prices and items can change; check with the business.

On Instagram @bakerhughesco

People Also Search