Tim Aerospace Services DWC

Tim Aerospace Services DWC

Dubai South

Is this your business?

Plan the visit

Practical details

Mohammed Bin Rashid Aerospace Hub, Supplier Complex - Premises No:212 - DWC
Madinat Al Mataar - Dubai South, Dubai
WhatsApp 0 565 029 966
From the business's own website
Mon9:00 AM – 5:00 PM
Tue9:00 AM – 5:00 PM
Wed9:00 AM – 5:00 PM
Thu9:00 AM – 5:00 PM
Fri9:00 AM – 5:00 PM
SatClosed
SunClosed
Get directions
Let's go!

Photos

From timaerospace.com

Services & prices

  • Tim Aerospace MRO DWC: A New Benchmark In Aviation Maintenance

    In the heart of Dubai’s expanding aviation hub at Al Maktoum International Airport (DWC), TIM Aerospace is poised to redefine the Maintenance, Repair, and Overhaul (MRO) industry.

  • Aircraft Repair & Maintenance

    Tim Aerospace provides a comprehensive range of services for the repair and maintenance of both passenger and cargo aircraft.

  • Aviation Solutions

    Tim Aerospace is committed to providing tailored and cost-effective aviation solutions specifically designed for the Gulf countries.

  • USD 50 / hour
    TIM 012 – Economic Manual Stacker

    Load: 2000 kg; Elevation: 2.2 m

  • USD 60
    TIM 013 -Air‑Conditioning Unit

    Flow: 400 lb/min; Max PSI: 400; Diesel; Output: 480/3/60

  • USD 400 / hour
    TIM 014 -De‑Icing Truck

    Load: 18,000 kg; Elevation: 6–10 m; Capacity: 8,000–15,000 L

  • USD 400 / hour
    TIM 015 – Tow Tug

    Power: 184 kW; Aircraft ≤300 tons

  • USD 50 / hour
    TIM 016 – Aircraft Wheel Dolly

    Hydraulic; For wheels & brakes

  • USD 50 / hour
    TIM 017 – Aircraft Wheel Dolly

    Hydraulic; For wheels & brakes

  • USD 150 / hour
    TIM 018 – Landing Gear Jack

    Load Capacity: 65 tons

  • USD 150 / hour
    TIM 019 – Landing Gear Jack

    Load Capacity: 65 tons

  • USD 200 / hour
    TIM 020 – Nitrogen Cart

    400–4000 PSI; Inlet: 6000 PSI; Weight: 460 kg

  • USD 50 / hour
    TIM 021 – Aircraft Maintenance Step

    3 m × 1.3 m × 6 m

  • USD 400 / hour
    TIM 022 – Hi-Loader

    Load: 7600 kg; Height: 1–5 m

  • USD 50 / hour
    TIM 023 – Aircraft Maintenance Step

    1.4 m × 1.1 m × 2.7 m

  • USD 50 / hour
    TIM 024 – Aircraft Maintenance Step

    3 m × 1.3 m × 6 m

  • USD 50 / hour
    TIM 025 – Aircraft Maintenance Step

    3 m × 1.3 m × 6 m

  • USD 150 / hour
    TIM 026 – Ground Power Unit

    400 Hz; 115/200V AC; 28V DC; 180 KVA

  • USD 150 / hour
    TIM 027 – Ground Power Unit

    400 Hz; 115/200V AC; 28V DC; 180 KVA

  • USD 200 / hour
    TIM 028 – Tower Light

    50 Hz; 1500 RPM; 400V; 3‑Phase; 76 kg

  • USD 200 / hour
    TIM 029 – Boom Lift

    Height: 21.38 m; Outreach: 12.30 m; Load: 250–360 kg

  • USD 50 / hour
    TIM 030 – Aircraft Maintenance Stairs

    4.7 m × 3.4 m × 6 m

  • USD 50 / hour
    TIM 031 – Aircraft Maintenance Step

    2 m × 1.3 m × 6 m

  • USD 50 / hour
    TIM 032 – Adjustable Maintenance Steps

    Height: 1.7–2.8 m; Width: 1 m; Length: 1 m

  • USD 200 / hour
    TIM 033 – Scissor Lift

    Height: 1–5.8 m; Width: 0.8 m; Length: 1.6 m; Capacity: 230 kg

  • USD 200 / hour
    TIM 034 – Scissor Lift

    Height: 1–5.8 m; Width: 0.8 m; Length: 1.6 m; Capacity: 230 kg

  • USD 300 / hour
    TIM 035 – Fork Lift

    Lift: 7000 kg; Height: 4 m; Truck Weight: 10,579 kg

  • USD 250 / hour
    TIM 036 – Passenger Step

    Serve aircraft such as Airbus: A300, A320, A330, A340, A350Boeing: B737, B747, B757, B767, B777

  • USD 75 / hour
    TIM 037 – Power Generator

    3x230V AC – 50hzPRP 4000W

  • USD 50 / hour
    Tim 039 – Dual Head LED Tower Light

    Portable dual-head LED floodlight tower 100W

  • USD 50 / hour
    Tim 040 – Dual Head LED Tower Light

    Portable dual-head LED floodlight tower 100W

  • USD 50 / hour
    Tim 041 – Extension Cable

    4 Socket 13A 250V-50Hz50 Meter

From timaerospace.com, read Oct 26, 2026. Prices and items can change; check with the business.

On Instagram @timaerospace

People Also Search